Bug Description:
As far as I've seen it so far, the Almayer Brig APC in the Security Office has missing wiring leading to the main grid, always requiring an MT to come fix it. It's not a big issue as there's just a small connection that needs to be made, but I don't think this was intentional.
Steps to reproduce:
1. Head to the Security Office
2. Crowbar the floor tiles under the filing cabinets and the door.
3. See that the connection between the APC and the main grid is missing there and APC is red without MT help.
Almayer Brig APC disconnected from main grid
- Cairath
- Registered user
- Posts: 73
- Joined: 08 Aug 2017, 06:37
- Byond: Cairath
Almayer Brig APC disconnected from main grid
This is what dreams nightmares are made of.
- Snypehunter007
- Registered user
- Posts: 2750
- Joined: 02 Dec 2015, 17:14
- Location: Georgia
- Byond: Snypehunter007
- Contact:
Re: Almayer Brig APC disconnected from main grid
Fixed in the next update.
Reached "Leet" post status on 3/14/17.
Death of the Suggestion Killer - 11/30/2017
Staff History:
Death of the Suggestion Killer - 11/30/2017
Staff History:
► Show Spoiler